Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Sept 2023 |
| Application filed | 21 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Danblock Brakes India Private Limited |
| Land area | 15.5 acres (6.3 ha) |
| Project cost | ₹165 crore |
| Village / locality | Pappankuppam |
| Taluk / tehsil | Gummidipoondi |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01110 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 21 Sept 2023 (this page) | Environmental approval granted | 15.5 acres | ₹165 crore |
| New project filed 22 Mar 2023 | More information requested | 15.5 acres | ₹165 crore |
In context
56 applications in Thiruvallur since January 2022 are in the same category (Industry): 32 approved, 19 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 15.5 acres, this one is smaller than 52% of them.
36 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pappankuppam, Gummidipoondi, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion Of Grey And Ductile Iron Castings Manufacturing — more information requested, 0 m away
- Integrated Common Hazardous Waste Treatment Storage & Disposal Facility at… — lapsed, 700 m away
- Proposed Expansion of Existing Production Capacity — environmental approval granted, 900 m away
- Proposed Expansion of Existing Production Capacity — more information requested, 900 m away
- Proposed Expansion of Existing Production Capacity — more information requested, 900 m away
- Expansion of Existing Billets manufacturing facility from 26,000 Tons per… — lapsed, 1 km away
- Expansion of Existing Billets manufacturing facility from 26,000 Tons per… — more information requested, 1 km away
- Expansion of Existing Billets manufacturing facility from 26,000 Tons per… — cleared for impact study, 1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.