Quick answers
What is Rough Stone and Gravel Quarry of Thiru. V. Murugaiyan?
Rough Stone and Gravel Quarry of Thiru. V. Murugaiyan is a proposed mining project in Duraiswamipuram, Sivakasi, Virudhunagar, Tamil Nadu. The site covers 4.2 acres.
Who is building it?
The applicant is Vellaiyan Murugaiyan.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Apr 2024), as of 27 Nov 2026.
Where is it?
In Duraiswamipuram, Sivakasi, Virudhunagar, Tamil Nadu.
How big is it?
It has a stated cost of ₹43 lakh and a site of 4.2 acres.
When was it filed?
The application was filed on 12 Mar 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Rough Stone and Gravel Quarry of Thiru. V. Murugaiyan
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Apr 2024 |
| Application filed | 12 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vellaiyan Murugaiyan |
| Land area | 4.2 acres (1.7 ha) |
| Project cost | ₹43 lakh |
| Village / locality | Duraiswamipuram |
| Taluk / tehsil | Sivakasi |
| District | Virudhunagar |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01144 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Apr 2025 | Environmental approval granted | 4.2 acres | ₹43 lakh |
| Early planning filed 12 Mar 2024 (this page) | Cleared for impact study | 4.2 acres | ₹43 lakh |
In context
207 applications in Virudhunagar since January 2022 are in the same category (Mining): 152 approved, 34 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.2 acres, this one is smaller than 64% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 12.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.
Where it is
Duraiswamipuram, Sivakasi, Virudhunagar, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry of Thiru. V. Murugaiyan — environmental approval granted, 0 m away
- Rough Stone and Gravel Quarry of Thiru. V.Rajendran — environmental approval granted, 350 m away
- Rough Stone and Gravel Quarry of Thiru. M. Palani Kumar — environmental approval granted, 500 m away
- Rough Stone and Gravel Quarry of Thiru. V. Rajendran — lapsed, 650 m away
- Rough Stone and Gravel Quarry of Thiru. G. Radhakrishnan — lapsed, 650 m away
- Rough Stone and Gravel Quarry of T.Baskaran — environmental approval granted, 1 km away
- Rough Stone and Gravel Quarry of Thiru.V.Sakthivel — environmental approval granted, 1.1 km away
- Roughstone and Gravel Quarry of Thiru S.Radhakrishnan — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.