Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Dec 2023 |
| Application filed | 12 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raghavan Pillai Vijayakumaran Nair |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹47 lakh |
| Village / locality | Pappakudi |
| Taluk / tehsil | Cheranmahadevi |
| District | Tirunelveli |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01188 |
In context
143 applications in Tirunelveli since January 2022 are in the same category (Mining): 107 approved, 18 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.3 acres, this one is smaller than 96% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 11.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Pappakudi, Cheranmahadevi, Tirunelveli, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tvl.A.K Blue Metals — lapsed, 150 m away
- Rough Stone and Gravel Quarry of Thiru.M.Sherif — environmental approval granted, 950 m away
- Rough stone and gravel quarry of Tvl. Indriya Granites, Thiru.M.D.Kuriakose… — under environmental review, 950 m away
- Rough Stone and Gravel Quarry of Mr. Josh Kuriakose, Managing Director,… — environmental approval granted, 2.9 km away
- Rough Stone and Gravel Quarry of Mr. Josh Kuriakose, Managing Director,… — environmental approval granted, 2.9 km away
- Konda.L.Rajakrishnan Rough stone and Gravel quarry — environmental approval granted, 3.9 km away
- Proposed Rough stone and Gravel Quarry of Thiru.A.Chittarasu — more information requested, 5.3 km away
- Rough Stone and Gravel Quarry Thiru.E.Mariappan — cleared for impact study, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.