Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Aug 2023 |
| Application filed | 3 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Mrf Limited |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹130.9 crore |
| Village / locality | Thiruvothiyur |
| Taluk / tehsil | Tiruvottiyur |
| District | Chennai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01226 |
In context
203 applications in Chennai since January 2022 are in the same category (Buildings & townships): 165 approved, 18 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.4 acres, this one is larger than 83% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thiruvothiyur, Tiruvottiyur, Chennai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project by Mrf Limited — lapsed, 0 m away
- Proposed Integrated Coastal Community Development in Thiruvotriyur, Chennai… — lapsed, 300 m away
- Proposed Construction of Residential Development in Thiruvottiyur village — environmental approval granted, 950 m away
- Fish Landing Centre (FLC) at Bharathiyar Nagar Beach, Ernavur Village,… — more information requested, 1000 m away
- High-Rise Residential Building by Radiance Realty Developers India Limited — environmental approval granted, 1 km away
- ETPS Expansion TPP - 1 x 660 MW — lapsed, 2.6 km away
- Amendment in Environmental Clearance for Proposed Construction of 6877 Ews… — environmental approval granted, 2.7 km away
- Proposed Capacity Expansion within Existing Manufacturing Unit — initial checks, 3 km away
More from Mrf Limited in Chennai
- Project by Mrf Limited — lapsed
All 4 Mrf projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.