One of 2 filings for this project. The project's main page, with every filing and where each stands: Thiru. S. Velu, Kasthurirengapuram Part-II Rough stone and Gravel Quarry Project over an…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 Apr 2024 |
| Application filed | 12 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sudalaiyandi Thevar Velu |
| Land area | 20.6 acres (8.3 ha) |
| Project cost | ₹5.6 crore |
| Village / locality | Kasturirangapuram |
| Taluk / tehsil | Radhapuram |
| District | Tirunelveli |
| State | Tamil Nadu |
| Location from | Site area on record |
| Our reference | WID-TN-01275 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Apr 2025 | Environmental approval granted | 20.6 acres | ₹5.6 crore |
| Early planning filed 12 Mar 2024 (this page) | Cleared for impact study | 20.6 acres | ₹5.6 crore |
In context
143 applications in Tirunelveli since January 2022 are in the same category (Mining): 107 approved, 18 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 20.6 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Kasturirangapuram, Radhapuram, Tirunelveli, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thiru. S. Velu, Kasthurirengapuram Part-II Rough stone and Gravel Quarry… — environmental approval granted, 0 m away
- Thiru.S.Sakthiperiyakumaran Over an extent of 4.50.2hectares of Patta land in… — environmental approval granted, 1.2 km away
- Rough Stone and Gravel Quarry Project Belongs to C. Robinraj — environmental approval granted, 2.1 km away
- Thiru. C. Robin Raj, Rough stone and Gravel Quarry Project over an Extent of… — not approved, 2.1 km away
- Thiru. C. Robin Raj, Rough stone and Gravel Quarry Project over an Extent of… — environmental approval granted, 2.1 km away
- Thiru. C. Robin Raj, Rough stone and Gravel Quarry Project over an Extent of… — cleared for impact study, 2.1 km away
- Uthayathur Village Rough Stone and Gravel Mining Project — environmental approval granted, 4.2 km away
- Tail end check Dam across Nambiyar River — lapsed, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.