One of 2 filings for this project. The project's main page, with every filing and where each stands: Rough Stone and Gravel Quarry of Thiru.S.Vellapandi
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 2 Mar 2025 |
| Application filed | 28 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vellapandi |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹83 lakh |
| Village / locality | Pirancheri |
| Taluk / tehsil | Manur |
| District | Tirunelveli |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01413 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Dec 2025 | Environmental approval granted | 5.4 acres | ₹83 lakh |
| Early planning filed 28 Dec 2024 (this page) | Cleared for impact study | 5.4 acres | ₹83 lakh |
In context
143 applications in Tirunelveli since January 2022 are in the same category (Mining): 107 approved, 18 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.4 acres, this one is smaller than 73% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Pirancheri, Manur, Tirunelveli, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry of Thiru.S.Vellapandi — environmental approval granted, 0 m away
- Thiru.M. Marutharaj Rough Stone & Gravel Quarry — environmental approval granted, 1.7 km away
- Chezhianallur Rough Stone and Gravel Quarry Project Belongs to M/s. Aswath… — cleared for impact study, 2 km away
- Thiru H. Amjad Pakkir Mohideen, Rough Stone and Gravel Quarry Project — environmental approval granted, 2.4 km away
- Thiru H. Amjad Pakkir Mohideen, Rough Stone and Gravel Quarry Project — cleared for impact study, 2.4 km away
- Proposed Rough Stone and Gravel Quarry of Thiru.G.Ayyadurai — environmental approval granted, 2.9 km away
- Rough Stone and Gravel Quarry of Thiru.K.Ayyadurai — environmental approval granted, 3.5 km away
- Rough Stone and gravel Quarry of Thiru.A.Chelladurai — environmental approval granted, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.