Quick answers
What is this project?
Rough Stone and Gravel Quarry of K.J.Ajay Thulasidharan, at Survey No.414 over an area of 3.985Ha is a lapsed mining project in Gunaramanallur, Tenkasi, Tamil Nadu. The site covers 9.9 acres.
Who is building it?
The applicant is Ajay Thulasi Dharan.
Has it been approved?
No. The application was lapsed on 3 Aug 2026, so it is no longer under consideration.
Where is it?
In Gunaramanallur, Tenkasi, Tamil Nadu.
How big is it?
It has a stated cost of ₹86 lakh and a site of 9.9 acres.
When was it filed?
The application was filed on 13 Aug 2024.
Project details
| Official title | Rough Stone and Gravel Quarry of K.J.Ajay Thulasidharan, at Survey No.414 over an area of 3.985Ha in Gunaramanallur Village, Tenkasi Taluk and district |
|---|---|
| Status | Lapsed |
| Status since | 3 Aug 2026 |
| Application filed | 13 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ajay Thulasi Dharan |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹86 lakh |
| Village / locality | Gunaramanallur |
| Taluk / tehsil | Tenkasi |
| District | Tenkasi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01419 |
In context
74 applications in Tenkasi since January 2022 are in the same category (Mining): 65 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 72% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Gunaramanallur, Tenkasi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M. Gandhi Selwyn, Rough Stone and Gravel Quarry Project — application filed, 1.4 km away
- Tmt P Sundari Gravel Quarry — environmental approval granted, 1.6 km away
- Rough Stone and Gravel Quarry of Thiru.P.Kovilpichai — environmental approval granted, 1.7 km away
- J. Nagoor Meeran, Rough Stone and gravel Quarry, Extent: 1.78.0ha, S.F.Nos.… — environmental approval granted, 3.6 km away
- Sillaraipuravu village - Rough stone and Gravel quarry (Extent. 2.21.0 Ha) — more information requested, 5.4 km away
- Rough Stone and Gravel Quarry of Thiru. Mohan K.Philip — lapsed, 5.4 km away
- Gravel Quarry of Thiru.P.Saravanapandian — environmental approval granted, 5.5 km away
- Gravel Quarry of Thiru.P.Saravanapandian — environmental approval granted, 5.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.