One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Refrigerant Gases Manufacturing Unit
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 31 May 2024 |
| Application filed | 29 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Chemplast Sanmar Limited |
| Land area | 51.9 acres (21 ha) |
| Project cost | ₹1,206.5 crore |
| Village / locality | Mettur |
| Taluk / tehsil | Mettur |
| District | Salem |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01561 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 25 Apr 2025 | Environmental approval granted | 51.9 acres | ₹1,206.5 crore |
| Early planning filed 29 May 2024 (this page) | Cleared for impact study | 51.9 acres | ₹1,206.5 crore |
In context
14 applications in Salem since January 2022 are in the same category (Industry): 11 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 51.9 acres, this one is smaller than 57% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mettur, Salem, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Refrigerant Gases Manufacturing Unit — environmental approval granted, 0 m away
- Expansion of Refrigerant Gas Manufacturing Unit — withdrawn, 50 m away
- Proposed Expansion of Poly Vinyl Chloride (PVC) Paste Resin from 66000 TPA to… — cleared for impact study, 3 km away
- Proposed Expansion of Poly Vinyl Chloride (PVC) Paste Resin from 66000 TPA to… — environmental approval granted, 3 km away
- Mettur Thermal Power Station -II (1X600MW) — lapsed, 3.2 km away
- Mettur Thermal Power Station-I — lapsed, 3.9 km away
- Tmt. P. Kalaiselvi, Rough stone and Gravel Quarry Project at over an Extent of… — lapsed, 5.6 km away
- Yellikaradu Black Granite Quarry 16.72.0Ha — environmental approval granted, 5.9 km away
More from Chemplast Sanmar Limited in Salem
- Proposed Expansion of Poly Vinyl Chloride (PVC) Paste Resin from 66000 TPA to… — environmental approval granted
- Proposed Expansion of Poly Vinyl Chloride (PVC) Paste Resin from 66000 TPA to… — cleared for impact study
- Expansion of Refrigerant Gas Manufacturing Unit — withdrawn
5 Chemplast Sanmar projects in Salem
All 25 Chemplast Sanmar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.