Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Sept 2024 |
| Application filed | 23 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sree Rengaraj Ispat Industries Private Limited |
| Land area | 74.1 acres (30 ha) |
| Project cost | ₹330.1 crore |
| Village / locality | Ingur |
| Taluk / tehsil | Perundurai |
| District | Erode |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01946 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Sept 2024 (this page) | Under environmental review | 74.1 acres | ₹330.1 crore |
| New project filed 29 Jan 2024 | More information requested | 74.1 acres | ₹330.1 crore |
In context
18 applications in Erode since January 2022 are in the same category (Industry): 13 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 74.1 acres, this one is larger than 83% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ingur, Perundurai, Erode, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion and Modification of Sponge Iron Plant {( Project area of 74.06 Acre… — cleared for impact study, 0 m away
- Proposed Expansion of Integrated Sponge Iron Plant (from Existing Sponge Iron… — more information requested, 0 m away
- Building Project Belongs to M/s Techno Activewear Private Limited — more information requested, 300 m away
- Proposed expansion of foundry unit located at SIPCOT Industrial Growth Centre,… — environmental approval granted, 400 m away
- Proposed synthetic organic chemicals manufacturing unit at Plot No, F-11,… — environmental approval granted, 850 m away
- Proposed synthetic organic chemicals manufacturing unit at Plot No, F-11,… — cleared for impact study, 850 m away
- Proposed synthetic organic chemicals manufacturing unit at Plot No, F-11,… — cleared for impact study, 850 m away
- Expansion of existing mill by M/s. K.P.R Mill Limited located — initial checks, 950 m away
More from Sree Rengaraj Ispat Industries Private Limited in Erode
- Expansion and Modification of Sponge Iron Plant {( Project area of 74.06 Acre… — cleared for impact study
All 3 Sree Rengaraj Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.