Quick answers
What is this project?
Disposal of All Types of Excavated Soil (Ordinary Earth) by Selling From Desilting Work Site in Korampallam River is an approved mining project in Kukaiyankarisal, Thoothukkudi, Tamil Nadu. The site covers 12 acres.
Who is building it?
The applicant is Mohan ram.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Dec 2024), as of 27 Nov 2026.
Where is it?
In Kukaiyankarisal, Thoothukkudi, Tamil Nadu.
How big is it?
It has a stated cost of ₹36 lakh and a site of 12 acres.
When was it filed?
The application was filed on 21 Nov 2024.
Project details
| Official title | Disposal of All Types of Excavated Soil (Ordinary Earth) by Selling From Desilting Work Site in Korampallam River in Thoothukudi District Part (B) |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Dec 2024 |
| Application filed | 21 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mohan ram |
| Land area | 12 acres (4.9 ha) |
| Project cost | ₹36 lakh |
| Village / locality | Kukaiyankarisal |
| Taluk / tehsil | Thoothukkudi |
| District | Thoothukkudi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01951 |
In context
97 applications in Thoothukkudi since January 2022 are in the same category (Mining): 79 approved, 14 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12 acres, this one is larger than 75% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kukaiyankarisal, Thoothukkudi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- TOR Validity Extension for Proposed Cement Grinding Unit of 0.2 MTPA in Survey… — more information requested, 3.3 km away
- TOR Validity Extension for Proposed Cement Grinding Unit of 0.2 MTPA in Survey… — cleared for impact study, 3.3 km away
- Cgd Project Thoothukudi Ga — coastal clearance granted, 4.4 km away
- LABSA plant within Existing Greenstar Acid plant Premises — returned to applicant, 5.1 km away
- Amendment in Environmental Clearance for Establishment of Labsa Plant Within… — withdrawn, 5.2 km away
- Modernization of DAP Plants for Production of Multi-grade Complex Fertilisers… — initial checks, 5.2 km away
- Labsa Plant Within Existing Greenstar Fertilizer Plant Premises — withdrawn, 5.2 km away
- Expansion of Industrial shed for Manufacturing of LABSA within M/s.Greenstar… — returned to applicant, 5.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.