Project details
| Official title | Construction of High Rise Residential Group Development Building by M/s. Alliance Infrastructure Projects Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 2 Apr 2025 |
| Application filed | 6 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Alliance Infrastructure Projects Private Limited |
| Use | Residential |
| Units | 1,449 |
| Towers | 8 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Height | 51 m |
| Parking spaces | 2,387 |
| Land area | 9.9 acres (4 ha) |
| Built-up area | 1,77,400 m² (19,09,516 sq ft) |
| Plot area | 40,209 m² (4,32,806 sq ft) |
| Project cost | ₹214.3 crore |
| Village / locality | Varadarajapuram |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01963 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Feb 2025 (this page) | Environmental approval granted | 9.9 acres | ₹214.3 crore |
| Early planning filed 27 Sept 2024 | Cleared for impact study | 9.9 acres | ₹214.3 crore |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is smaller than 66% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Varadarajapuram, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- High Rise Residential Group Development Building by M/s. Alliance… — cleared for impact study, 0 m away
- Construction of Residential Building With Club House by R.K.Estates — more information requested, 2.6 km away
- Laying of Optical Fibre Cable (Under Ground) Through Approved Access Road to… — lapsed, 2.9 km away
- Proposed Revised & Additional Construction of High Rise Group Development by… — under environmental review, 3 km away
- High Rise Group Development by M/s Casa Grande Homes Private Limited — environmental approval granted, 3 km away
- High Rise Group Development by M/s Casa Grande Homes Private Limited — cleared for impact study, 3 km away
- Laying of UG OFC from Poonthandalam to Dharakastinapuram via. Somangalam… — lapsed, 3.3 km away
- Laying of UG OFC along the roadside from Erumaiyur to Poonthandalam via.… — more information requested, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.