Quick answers
What is Proposed construction of Commercial Multistoried Buildings?
Proposed construction of Commercial Multistoried Buildings is an approved commercial project in Keeranatham, Annur, Coimbatore, Tamil Nadu. It plans 3 towers of up to 10 floors on 4.7 acres.
Who is building it?
The applicant is Wynfra Cybercity LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Jun 2024), as of 27 Nov 2026.
Where is it?
In Keeranatham, Annur, Coimbatore, Tamil Nadu.
How big is it?
It has a stated cost of ₹276 crore and a site of 4.7 acres.
When was it filed?
The application was filed on 22 May 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Jun 2024 |
| Application filed | 22 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Wynfra Cybercity LLP |
| Use | Commercial |
| Towers | 3 |
| Floors (tallest) | 10 |
| Basements | 2 |
| Height | 45 m |
| Parking spaces | 342 |
| Land area | 4.7 acres (1.9 ha) |
| Built-up area | 95,491 m² (10,27,856 sq ft) |
| Plot area | 19,063 m² (2,05,192 sq ft) |
| Project cost | ₹276 crore |
| Village / locality | Keeranatham |
| Taluk / tehsil | Annur |
| District | Coimbatore |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02000 |
In context
147 applications in Coimbatore since January 2022 are in the same category (Buildings & townships): 105 approved, 31 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.7 acres, this one is smaller than 69% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Keeranatham, Annur, Coimbatore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of IT Park building located at S.F. No. 307/2, 308/1, 2,… — environmental approval granted, 800 m away
- Proposed expansion of IT Park building located at S.F. No. 307/2, 308/1, 2,… — cleared for impact study, 800 m away
- Non-High Rise Residential Building Development Project by M/s. Casagrand… — environmental approval granted, 2 km away
- Existing Standalone Steel Rolling Mill located at S.F. No. 356/3B, 349,… — lapsed, 2.6 km away
- Residential Non- High – Rise Group Development @ Narasimhanaickenpalayam by… — under environmental review, 3.1 km away
- Proposed Expansion of Educational Institution Buildings With Software Park — environmental approval granted, 3.2 km away
- Proposed Expansion of Educational Institution Buildings With Software Park — environmental approval granted, 3.2 km away
- Proposed expansion of educational institution buildings — initial checks, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.