Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Apr 2024 |
| Application filed | 14 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kamachi Steels Private Limited |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹6.4 crore |
| Village / locality | Pappankuppam |
| Taluk / tehsil | Gummidipoondi |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02029 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 14 Mar 2024 (this page) | Cleared for impact study | 1.5 acres | ₹6.4 crore |
| New project filed 22 Jan 2024 | More information requested | 1.5 acres | ₹6.4 crore |
In context
56 applications in Thiruvallur since January 2022 are in the same category (Industry): 32 approved, 19 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.5 acres, this one is smaller than 98% of them.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pappankuppam, Gummidipoondi, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing Rolling Mill with Re-Heating Furnace with 5000 TPM Production… — more information requested, 0 m away
- Proposed Expansion of Steel Melting plant by M/s. ARS Steels & Alloy… — under wildlife review, 100 m away
- Proposed Expansion of Steel Melting plant by M/s. ARS Steels & Alloy… — environmental approval granted, 100 m away
- Proposed Expansion of Steel Melting plant by M/s. ARS Steels & Alloy… — cleared for impact study, 100 m away
- Expansion of Existing Billets manufacturing facility from 26,000 Tons per… — lapsed, 400 m away
- Expansion of Existing Billets manufacturing facility from 26,000 Tons per… — more information requested, 400 m away
- Expansion of Existing Billets manufacturing facility from 26,000 Tons per… — cleared for impact study, 400 m away
- Proposed Expansion of Existing Production Capacity — environmental approval granted, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.