Project details
| Official title | Expansion of Iron Foundry Unit from 54000 TPA to 118661 TPA (Liquid Metal) by M/s. Nelcast Limited in Madhavaram Village, Ponneri Taluk, Tiruvallur District. |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Mar 2025 |
| Application filed | 20 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Nelcast LTD |
| Land area | 32.9 acres (13.3 ha) |
| Project cost | ₹190 crore |
| Village / locality | Madhavaram |
| Taluk / tehsil | Ponneri |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02034 |
In context
56 applications in Thiruvallur since January 2022 are in the same category (Industry): 32 approved, 19 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 32.9 acres, this one is larger than 66% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Madhavaram, Ponneri, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thadaperumbakkam-2 Village Ordinary Earth Quarry Lease — environmental approval granted, 1.9 km away
- Tvl. K.G.K. Engineers Private Limited,Ordinary Earth Quarry project over an… — environmental approval granted, 2.6 km away
- Tvl. K.G.K. Engineers Private Limited,Ordinary Earth Quarry project over an… — environmental approval granted, 2.6 km away
- R.M.K College of Engineering and Technology by Lakshmikanthammal Educational… — returned to applicant, 2.6 km away
- Jaganathapuram - 3 Villagr Ordinary Earth Mining Lease Project — returned to applicant, 2.7 km away
- Proposed Expansion in Industrial Adhesives (48.5 Kl/Month to 100 Kl/Month,… — under environmental review, 3.9 km away
- Proposed Expansion in Industrial Adhesives (48.5 Kl/Month to 100 Kl/Month,… — cleared for impact study, 3.9 km away
- Industrial Building for Manufacturing of Rail Wheels, Axle and Wheel Set… — environmental approval granted, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.