Quick answers
What is Rough Stone and gravel Quarry of Selvi.T.Nithyasree?
Rough Stone and gravel Quarry of Selvi.T.Nithyasree is an approved mining project in Vadugamangalam, Vandavasi, Tiruvannamalai, Tamil Nadu. The site covers 5.5 acres.
Who is building it?
The applicant is Nithyasree T.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Jan 2025), as of 27 Nov 2026.
Where is it?
In Vadugamangalam, Vandavasi, Tiruvannamalai, Tamil Nadu.
How big is it?
It has a stated cost of ₹1 crore and a site of 5.5 acres.
When was it filed?
The application was filed on 24 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Jan 2025 |
| Application filed | 24 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nithyasree T |
| Land area | 5.5 acres (2.2 ha) |
| Project cost | ₹1 crore |
| Village / locality | Vadugamangalam |
| Taluk / tehsil | Vandavasi |
| District | Tiruvannamalai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02072 |
In context
227 applications in Tiruvannamalai since January 2022 are in the same category (Mining): 180 approved, 33 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.5 acres, this one is smaller than 51% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Vadugamangalam, Vandavasi, Tiruvannamalai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry of Thiru. T. Karthi — initial checks, 2.1 km away
- Tvl. Vishnusurya Project and Infra Limited, Rough Stone and Gravel Quarry,… — environmental approval granted, 2.1 km away
- Rough Stone and Gravel Quarry Project Belongs to M/s. VSK Logistics. — environmental approval granted, 3.1 km away
- Vishnusurya Projects and Infra Ltd., Rough and Gravel Quarry Project, Extent:… — environmental approval granted, 3.3 km away
- Vishnusurya Projects and Infra Ltd., Rough and Gravel Quarry Project, Extent:… — cleared for impact study, 3.3 km away
- Proposed Rough stone and Gravel Quarry of M/s. WIGRESS Mining LLP,… — environmental approval granted, 4.1 km away
- To Lay the Electricity Line to Open Well at Survey No. 373/2c of Vadthinnalur… — lapsed, 4.7 km away
- Widening from Intermediate lane to Two lane and Improvement to Chengampoondi… — forest land use approved, 5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.