What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Kanchipuram, Tamil Nadu

Proposed Expansion of Industrial Buildings for Manufacturing of Automotive Components by M/s. L.G. Balakrishnan & Bros Limited

Proposed Expansion of Industrial Buildings for Manufacturing of Automotive Components by M/s. L.G. Balakrishnan & Bros Limited is an approved industrial building project in Vadakal, Sriperumbudur, Kanchipuram, Tamil Nadu. It plans 7 towers of up to 2 floors on 10 acres. Its stated project cost is ₹116.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 Jan 2025).

See it on the live map All projects in Kanchipuram

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since8 Jan 2025
Application filed22 Nov 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantL G Balakrishnan & Bros LTD
UseIndustrial
Towers7
Floors (tallest)2
Height17 m
Parking spaces233
Land area10 acres (4 ha)
Built-up area22,088 m² (2,37,753 sq ft)
Plot area40,428 m² (4,35,163 sq ft)
Project cost₹116.4 crore
Village / localityVadakal
Taluk / tehsilSriperumbudur
DistrictKanchipuram
StateTamil Nadu
Location fromSite boundary on record
Our referenceWID-TN-02311

In context

219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10 acres, this one is smaller than 65% of them.

42 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vadakal, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.