What is Expansion of Organic Chemicals Manufacturing Unit?
Expansion of Organic Chemicals Manufacturing Unit is a proposed industrial project in Kadaperi, Tambaram, Chengalpattu, Tamil Nadu. The site covers 97,496.6 acres.
Who is building it?
The applicant is Pharmazell (India) Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Jul 2024), as of 27 Nov 2026.
Where is it?
In Kadaperi, Tambaram, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹10 crore and a site of 97,496.6 acres.
When was it filed?
The application was filed on 20 Jun 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Organic Chemicals Manufacturing Unit
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Jul 2024 |
| Application filed | 20 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Pharmazell (India) Private Limited |
| Land area | 97,496.6 acres (39,455.6 ha) |
| Project cost | ₹10 crore |
| Village / locality | Kadaperi |
| Taluk / tehsil | Tambaram |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02370 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 26 Feb 2025 | Environmental approval granted | 1.7 acres | ₹10 crore |
| Early planning filed 20 Jun 2024 (this page) | Cleared for impact study | 97,496.6 acres | ₹10 crore |
In context
18 applications in Chengalpattu since January 2022 are in the same category (Industry): 12 approved, 6 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 97,496.6 acres, this one is larger than 94% of them.
51 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kadaperi, Tambaram, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Organic Chemicals Manufacturing Unit — environmental approval granted, 0 m away
- Proposed Expansion of the Existing Production Capacity — under environmental review, 0 m away
- Proposed Expansion of the Existing Production Capacity — cleared for impact study, 0 m away
- Formation of Approach Road to Our Patta Land of Chengalpattu District — lapsed, 450 m away
- Proposed UG OFC laying works along the roadside from Tambaram to… — more information requested, 500 m away
- Supply, Erection & Commissioning of Product Water Transmission Mains for the… — more information requested, 550 m away
- Underground Ofc Laying Works Along the Roadside From Tambaram to… — more information requested, 600 m away
- Formation of Pulikkoradu Road in Pulikkoradu Reserved Forest of Tambaram… — lapsed, 1 km away
All 4 Pharmazell projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.