Project details
| Official title | Thiru. P. Jagadeesan, Rough Stone and Gravel Quarry Project over an Extent of 1.05.50Ha of Patta lands in S.F.No.50/1A of Ekkattampalayam Village, Perundurai Taluk, Erode District, Tamil Nadu State |
|---|---|
| Status | Environmental approval granted |
| Status since | 7 Dec 2024 |
| Application filed | 11 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Palnisamy Jagadeesan |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹33 lakh |
| Village / locality | Chennimalai Rf |
| Taluk / tehsil | Perundurai |
| District | Erode |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02424 |
In context
66 applications in Erode since January 2022 are in the same category (Mining): 48 approved, 8 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.6 acres, this one is smaller than 88% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 9.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Chennimalai Rf, Perundurai, Erode, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- P.Mahendran Rough stone and Gravel quarry project — environmental approval granted, 400 m away
- EKKATTAMPALAYAM VILLAGE, Rough Stone and Gravel Quarry Project Belongs to S.… — cleared for impact study, 650 m away
- Ekkattampalayam Village Rough Stone and Gravel Mining Lease — environmental approval granted, 900 m away
- Renewal of lease for Chennimalai Police Repeater Station at Chennaimalai RF — lapsed, 2.1 km away
- Renewal of lease for Chennimalai Police Repeater Station at Chennaimalai RF — lapsed, 2.1 km away
- Proposed Expansion of Steel Melting Plant and Inclusion of Steel Rolling Mill — lapsed, 3.1 km away
- Proposed Expansion of Steel Melting Plant and Inclusion of Steel Rolling Mill — cleared for impact study, 3.1 km away
- Improvement of Ghat Road for Arulmigu Subramaniya Swamy Temple, Chennimalai — lapsed, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.