Quick answers
What is Rough stone Quarry of Thiru.J.Arul?
Rough stone Quarry of Thiru.J.Arul is an approved mining project in Sattanar, Thandrampet, Tiruvannamalai, Tamil Nadu. The site covers 2.4 acres.
Who is building it?
The applicant is Arul.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Mar 2025), as of 27 Nov 2026.
Where is it?
In Sattanar, Thandrampet, Tiruvannamalai, Tamil Nadu.
How big is it?
It has a stated cost of ₹99 lakh and a site of 2.4 acres.
When was it filed?
The application was filed on 16 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Mar 2025 |
| Application filed | 16 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Arul |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Sattanar |
| Taluk / tehsil | Thandrampet |
| District | Tiruvannamalai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02487 |
In context
227 applications in Tiruvannamalai since January 2022 are in the same category (Mining): 180 approved, 33 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.4 acres, this one is smaller than 95% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Sattanar, Thandrampet, Tiruvannamalai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sathanur Black Granite — environmental approval granted, 1.8 km away
- Sathanur Black Granite — cleared for impact study, 1.8 km away
- Veeranam Black Granite Quarry — environmental approval granted, 2.6 km away
- Veeranam Black Granite Quarry — environmental approval granted, 2.6 km away
- Veeranam Black Granite Quarry — cleared for impact study, 2.6 km away
- Rough Stone Quarry of Thiru.R. Elanchezhian — environmental approval granted, 5.3 km away
- Laying of Underground Ofc Along the Road Side Which Cross the Forest Areas of… — lapsed, 5.4 km away
- Laying of Underground Ofc Along the Road Side Which Cross the Forest Areas of… — lapsed, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.