Quick answers
What is this project?
Residential Building Non-Hise rise group development by M/s. Exotia Builders Private Limited is an approved residential project in Puduppakkam, Tiruporur, Chengalpattu, Tamil Nadu. It plans 469 units in 4 towers of up to 5 floors on 8.5 acres.
Who is building it?
The applicant is Exotia Builder Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Jan 2025), as of 27 Nov 2026.
Where is it?
In Puduppakkam, Tiruporur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹287.5 crore and a site of 8.5 acres.
When was it filed?
The application was filed on 19 Dec 2024.
Project details
| Official title | Proposed Construction of Residential Building Non-Hise rise group development by M/s. Exotia Builders Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 11 Jan 2025 |
| Application filed | 19 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Exotia Builder Private Limited |
| Use | Residential |
| Units | 469 |
| Towers | 4 |
| Floors (tallest) | 5 |
| Basements | 1 |
| Height | 18 m |
| Parking spaces | 606 |
| Land area | 8.5 acres (3.5 ha) |
| Built-up area | 1,04,152 m² (11,21,082 sq ft) |
| Plot area | 34,453 m² (3,70,849 sq ft) |
| Project cost | ₹287.5 crore |
| Village / locality | Puduppakkam |
| Taluk / tehsil | Tiruporur |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02500 |
In context
302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.5 acres, this one is smaller than 57% of them.
81 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Puduppakkam, Tiruporur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Data centre Building (DC3) — environmental approval granted, 1.1 km away
- Data centre Building (DC3) — environmental approval granted, 1.1 km away
- Building project by M/s DATA PATTERNS (INDIA) LTD — environmental approval granted, 1.2 km away
- Expansion of Proposed Construction of Residential Township by Pacifica… — environmental approval granted, 1.3 km away
- Expansion of Proposed Construction of Residential Township by Pacifica… — cleared for impact study, 1.3 km away
- Residential Building - Phase 2 at Eden Park Township with Built up area of… — environmental approval granted, 1.4 km away
- Proposed Expansion in Construction of Multi- Storied Residential Buildings at… — under environmental review, 1.4 km away
- Multi- Storied Residential Buildings at Eden Park Township development — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.