Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Feb 2025 |
| Application filed | 13 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M Bharanitharan |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹26 lakh |
| Village / locality | Pakkanadu |
| Taluk / tehsil | Edappadi |
| District | Salem |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02512 |
In context
182 applications in Salem since January 2022 are in the same category (Mining): 113 approved, 37 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.4 acres, this one is larger than 78% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Pakkanadu, Edappadi, Salem, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mettur Thermal Power Station-I — lapsed, 6 km away
- A.Ramasamy, Red Earth Quarry Project, Extent: 3.23.5ha, S.F.Nos. 92/1, 92/2,… — environmental approval granted, 6.3 km away
- Mettur Thermal Power Station -II (1X600MW) — lapsed, 6.6 km away
- Permission for Drilling of Boreholes in Mettur Beat, Mettur Range, Salem… — lapsed, 8 km away
- Yellikaradu Black Granite Quarry 16.72.0Ha — environmental approval granted, 8.1 km away
- Permission for Topographical Survey in Mettur Beat, Mettur Range, Salem Forest… — forest land use approved, 8.2 km away
- Greenko TN-11 Off-Stream Closed Loop Pumped Storage Project — cleared for impact study, 9.3 km away
- Expansion of Refrigerant Gas Manufacturing Unit — withdrawn, 9.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.