Quick answers
What is this project?
K. Rajkumar, Rough stone and Gravel Quarry Project over an Extent of 1.24.1ha of Patta land is an approved mining project in Pidampalli, Sulur, Coimbatore, Tamil Nadu. The site covers 3.1 acres.
Who is building it?
The applicant is Krishnaswamy Rajkumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Nov 2024), as of 27 Nov 2026.
Where is it?
In Pidampalli, Sulur, Coimbatore, Tamil Nadu.
How big is it?
It has a stated cost of ₹33 lakh and a site of 3.1 acres.
When was it filed?
The application was filed on 20 Mar 2024.
Project details
| Official title | K. Rajkumar, Rough stone and Gravel Quarry Project over an Extent of 1.24.1ha of Patta land in S.F.No. 380/2(P) of Peedampalli Village, Sulur Taluk and Coimbatore District, Tamil Nadu State. |
|---|---|
| Status | Environmental approval granted |
| Status since | 29 Nov 2024 |
| Application filed | 20 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Krishnaswamy Rajkumar |
| Land area | 3.1 acres (1.2 ha) |
| Project cost | ₹33 lakh |
| Village / locality | Pidampalli |
| Taluk / tehsil | Sulur |
| District | Coimbatore |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02551 |
In context
204 applications in Coimbatore since January 2022 are in the same category (Mining): 172 approved, 21 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.1 acres, this one is smaller than 82% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Pidampalli, Sulur, Coimbatore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of foundry unit — cleared for impact study, 3.2 km away
- S.Nanadhagopal Rough Stone and Gravel Quarry — cleared for impact study, 3.4 km away
- Orattukuppai Rough Stone and Gravel Quarry Project Belongs to M/s. Ultra… — cleared for impact study, 3.9 km away
- Proposed expansion of Ferrous Casting from 19200 TPA to 74400 TPA by M/s.… — environmental approval granted, 4.3 km away
- Proposed expansion of Ferrous Casting from 19200 TPA to 74400 TPA by M/s.… — cleared for impact study, 4.3 km away
- Tvl. Tamilnadu Blue Metals, Rough Stone and Gravel Quarry, Extent: 1.91.0ha… — environmental approval granted, 4.5 km away
- Tvl. Tamilnadu Blue Metals, Rough Stone and Gravel Quarry, Extent: 1.91.0ha… — cleared for impact study, 4.5 km away
- M/s. Ultra Sahara Sand, Rough Stone and Gravel Quarry Project, Extent:… — not approved, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.