Quick answers
What is this project?
Proposed Captive Resin Plant with a Production Capacity of 21250 kg/day for Manufacturing of Plywood & Block Boards at 4329 MT/Month is an approved industrial project in Melpettai, Tindivanam, Viluppuram, Tamil Nadu. The site covers 14.8 acres.
Who is building it?
The applicant is Hg Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 May 2024), as of 27 Nov 2026.
Where is it?
In Melpettai, Tindivanam, Viluppuram, Tamil Nadu.
How big is it?
It has a stated cost of ₹111.1 crore and a site of 14.8 acres.
When was it filed?
The application was filed on 26 Mar 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 May 2024 |
| Application filed | 26 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Hg Industries Limited |
| Land area | 14.8 acres (6 ha) |
| Project cost | ₹111.1 crore |
| Village / locality | Melpettai |
| Taluk / tehsil | Tindivanam |
| District | Viluppuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02646 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 26 Mar 2024 (this page) | Environmental approval granted | 14.8 acres | ₹111.1 crore |
| New project filed 21 Jun 2023 | Environmental approval granted | 14.8 acres | ₹111.1 crore |
In context
8 applications in Viluppuram since January 2022 are in the same category (Industry): 8 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Melpettai, Tindivanam, Viluppuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Captive Resin Plant with a Production Capacity of 21250 kg/day for… — environmental approval granted, 0 m away
- Earth Quarry of M/s. EKK Infrastructure Limited — environmental approval granted, 3.6 km away
- Rough Stone and Gravel Quarry of Thiru.M.Satheesh — environmental approval granted, 4.8 km away
- Vairapuram Village Rough Stone and Gravel Quarry Project — environmental approval granted, 4.9 km away
- New Special Economic Zone in Tindivanam Industrial Complex — returned to applicant, 6.7 km away
- New Special Economic Zone in Tindivanam Industrial Complex — cleared for impact study, 6.7 km away
- Proposed Active Pharmaceutical Ingredients & Intermediates Manufacturing Unit… — environmental approval granted, 6.9 km away
- Proposed Active Pharmaceutical Ingredients & Intermediates Manufacturing Unit… — cleared for impact study, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.