Quick answers
What is Proposed Rough stone and Gravel Quarry of Thiru.B.Askar?
Proposed Rough stone and Gravel Quarry of Thiru.B.Askar is an approved mining project in Mel Padur, Chengam, Tiruvannamalai, Tamil Nadu. The site covers 5.1 acres.
Who is building it?
The applicant is Askar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Mar 2026), as of 27 Nov 2026.
Where is it?
In Mel Padur, Chengam, Tiruvannamalai, Tamil Nadu.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 5.1 acres.
When was it filed?
The application was filed on 5 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Mar 2026 |
| Application filed | 5 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Askar |
| Land area | 5.1 acres (2.1 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Mel Padur |
| Taluk / tehsil | Chengam |
| District | Tiruvannamalai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02684 |
In context
227 applications in Tiruvannamalai since January 2022 are in the same category (Mining): 180 approved, 33 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.1 acres, this one is smaller than 55% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mel Padur, Chengam, Tiruvannamalai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Aerial Ofc Along the Road Side From Karuthuvampadi to Devanampattu… — lapsed, 5.3 km away
- Laying of Aerial Ofc Along the Road Side From Karuthuvampadi to Devanampattu… — lapsed, 5.3 km away
- Widening From Single Lane to Intermediate Lane and Strengthening of Usambadi… — lapsed, 5.3 km away
- Rough Stone Quarry of Thiru.M.Ayyakannu — environmental approval granted, 6.9 km away
- Proposed Rough Stone Quarry of Tmt.R.Kalpana — environmental approval granted, 7.2 km away
- Proposed Rough Stone Quarry of Tmt.R.Kalpana — cleared for impact study, 7.2 km away
- Laying of Aerial Ofc Along the Road Side Which Cross the Forest Areas of… — lapsed, 8.1 km away
- Laying of Aerial Ofc Along the Road Side From Thinderkuppam to Kaliyandal… — lapsed, 8.1 km away