Quick answers
What is Proposed Rough Stone Quarry of Thiru.G.Muruganandam?
Proposed Rough Stone Quarry of Thiru.G.Muruganandam is a lapsed mining project in Palaiyam, Arcot, Ranipet, Tamil Nadu. The site covers 2 acres.
Who is building it?
The applicant is Muruganandam.
Has it been approved?
No. The application was lapsed on 2 Feb 2026, so it is no longer under consideration.
Where is it?
In Palaiyam, Arcot, Ranipet, Tamil Nadu.
How big is it?
It has a stated cost of ₹73 lakh and a site of 2 acres.
When was it filed?
The application was filed on 23 Aug 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Feb 2026 |
| Application filed | 23 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Muruganandam |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹73 lakh |
| Village / locality | Palaiyam |
| Taluk / tehsil | Arcot |
| District | Ranipet |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02698 |
In context
74 applications in Ranipet since January 2022 are in the same category (Mining): 46 approved, 20 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2 acres, this one is smaller than 99% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Palaiyam, Arcot, Ranipet, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Paradharami Earth Quarry Project Belongs to Thiru. S. Thirumeni — under environmental review, 3.3 km away
- Kaniyanur Ordinary Earth Quarry Belongs to Thiru.P.Srinivasan — initial checks, 4.8 km away
- Proposed Common Bio-Medical Waste Treatment Facility — cleared for impact study, 7.5 km away
- Padi Village Rough Stone and Gravel Mining Project — environmental approval granted, 7.9 km away
- Rough Stone and Gravel Quarry of M/s.Dhana Blue Metals, (Proprietor… — environmental approval granted, 8.1 km away
- Rough Stone and Gravel Quarry of M/s.Dhana Blue Metals, (Proprietor… — cleared for impact study, 8.1 km away
- Anaimallur Rough Stone and Gravel Mining Lease — under environmental review, 8.8 km away
- Anaimallur Rough Stone and Gravel Mining Lease — under environmental review, 8.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.