Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Jun 2025 |
| Application filed | 30 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | A sankar |
| Land area | 12.2 acres (4.9 ha) |
| Project cost | ₹9 lakh |
| Village / locality | Thervoy |
| Taluk / tehsil | Gummidipoondi |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02756 |
In context
126 applications in Thiruvallur since January 2022 are in the same category (Mining): 95 approved, 16 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.2 acres, this one is larger than 97% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 19 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Thervoy, Gummidipoondi, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- TVL. SPK And Co. — lapsed, 100 m away
- Active Pharma Ingredients (Bulk drug and intermediates) manufacturing unit for… — under environmental review, 600 m away
- Industrial Building for Recycling Facility by Pondy Oxides and Chemicals Limited — environmental approval granted, 1.1 km away
- Proposed Common Biomedical Waste Treatment Facility (CBWTF) — environmental approval granted, 1.4 km away
- Proposed Common Biomedical Waste Treatment Facility (CBWTF) — cleared for impact study, 1.4 km away
- Proposed Expansion in Saleable Castings Products From 27,500 Tpa to 95,040 Tpa… — environmental approval granted, 1.5 km away
- Proposed Expansion in Saleable Castings Products From 27,500 Tpa to 95,040 Tpa… — cleared for impact study, 1.5 km away
- Proposed Expansion of Saleable Casting manufacturing plant Construction by M/s… — lapsed, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.