Quick answers
What is this project?
B. Sathis Earth Quarry Project, Extent: 0.43.0ha, S.F. No: 194/7, Vairavankulam Village, Kadayanallur Taluk, Tirunelveli District is a proposed mining project in Vairavankulam, Kadayanallur, Tenkasi, Tamil Nadu. The site covers 1.1 acres.
Who is building it?
The applicant is Sathish B.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Vairavankulam, Kadayanallur, Tenkasi, Tamil Nadu.
How big is it?
It has a stated cost of ₹4 lakh and a site of 1.1 acres.
When was it filed?
The application was filed on 27 Mar 2025.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 21 Jul 2025 |
| Application filed | 27 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sathish B |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Vairavankulam |
| Taluk / tehsil | Kadayanallur |
| District | Tenkasi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02840 |
In context
74 applications in Tenkasi since January 2022 are in the same category (Mining): 65 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.1 acres, this one is smaller than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Vairavankulam, Kadayanallur, Tenkasi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thiru V Maripandi Rough Stone, Jelly and Gravel Quarry — environmental approval granted, 9.2 km away
- Thiru V Maripandi Rough Stone, Jelly and Gravel Quarry — cleared for impact study, 9.2 km away
- Proposed Roughstone and Gravel Quarry of Thiru.P.Murugaraj — environmental approval granted, 9.3 km away
- Rough stone and Gravel Quarry of Thiru.V.M.Sundaraiah — environmental approval granted, 9.5 km away
- Rough Stone Quarry of Thiru. V.M.Sundaraiah — environmental approval granted, 9.5 km away
- Rough Stone Quarry of Thiru. V.M.Sundaraiah — cleared for impact study, 9.5 km away
- Thiru S.Sundaramahalingam Rough Stone & Gravel Quarry — environmental approval granted, 10.7 km away
- Ordinary Earth Quarry of M/s.PKM Infrastructure — environmental approval granted, 13.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.