Quick answers
What is Earth Quarry of Tvl.Murugan Construction?
Earth Quarry of Tvl.Murugan Construction is an approved mining project in Kiripatti, Usilampatti, Madurai, Tamil Nadu. The site covers 4.9 acres.
Who is building it?
The applicant is Murugan Construction.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Feb 2026), as of 27 Nov 2026.
Where is it?
In Kiripatti, Usilampatti, Madurai, Tamil Nadu.
How big is it?
It has a stated cost of ₹5 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 24 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Feb 2026 |
| Application filed | 24 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Murugan Construction |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Kiripatti |
| Taluk / tehsil | Usilampatti |
| District | Madurai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02858 |
In context
109 applications in Madurai since January 2022 are in the same category (Mining): 92 approved, 14 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.9 acres, this one is smaller than 60% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kiripatti, Usilampatti, Madurai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Uthappanaickkanur Village Limestone Mine — environmental approval granted, 5.1 km away
- Thiru C Oorkalan Gravel Quarry — environmental approval granted, 6.8 km away
- Gravel Quarry of Tmt.R.Annakili — environmental approval granted, 7.1 km away
- Erection of 765KV DC transmission Line from Virudhunagar to Coimbatore… — more information requested, 8 km away
- Panamooppanpatti Limestone Mine of Tmt.B.Thiraviam — environmental approval granted, 8.5 km away
- Panamooppanpatti Limestone Mine of Tmt.B.Thiraviam — cleared for impact study, 8.5 km away
- Quartz and Feldspar mine of Tmt. B. Thiraviam — returned to applicant, 8.6 km away
- Gravel Quarry project Belongs to P. Rajendra Prasath, Extent: 4.46.0ha… — environmental approval granted, 9.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.