Quick answers
What is Rough Stone and Gravel Quarry of Thiru. D. Balaji?
Rough Stone and Gravel Quarry of Thiru. D. Balaji is a proposed mining project in Padalur (E), Alathur, Perambalur, Tamil Nadu. The site covers 6.8 acres.
Who is building it?
The applicant is D Balaji.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 3 Jul 2025), as of 27 Nov 2026.
Where is it?
In Padalur (E), Alathur, Perambalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 6.8 acres.
When was it filed?
The application was filed on 20 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Rough Stone and Gravel Quarry of Thiru. D. Balaji
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 Jul 2025 |
| Application filed | 20 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | D Balaji |
| Land area | 6.8 acres (2.8 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Padalur (E) |
| Taluk / tehsil | Alathur |
| District | Perambalur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02995 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 May 2026 | Environmental approval granted | 6.8 acres | ₹1.1 crore |
| Early planning filed 20 May 2025 (this page) | Cleared for impact study | 6.8 acres | ₹1.1 crore |
In context
96 applications in Perambalur since January 2022 are in the same category (Mining): 70 approved, 15 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.8 acres, this one is larger than 86% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 24.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 29 mining leases have applied within 5 km.
Where it is
Padalur (E), Alathur, Perambalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry of Thiru. D. Balaji — environmental approval granted, 0 m away
- Proposed Roughstone quarry of M/s. Sri Manjunathan Industries — lapsed, 250 m away
- Rough Stone Quarry of M/s. Sri Manjunathan Industries — not approved, 250 m away
- Proposed Rough stone Quarry of M/s. Surya Stones — environmental approval granted, 400 m away
- Proposed Rough stone Quarry of M/s. Surya Stones — cleared for impact study, 400 m away
- Rough stone Quarry of M/s.Shrivari Blue Metal — environmental approval granted, 400 m away
- Rough stone Quarry of M/s.Shrivari Blue Metal — cleared for impact study, 400 m away
- Padalur East Village Rough Stone and Gravel Quarry Lease — environmental approval granted, 650 m away