Quick answers
What is this project?
Proposed Rough Stone & Gravel Quarry of M/s. EKK Infrastructure Limited is an approved mining project in Ulagalampundi, Vikravandi, Viluppuram, Tamil Nadu. The site covers 6.5 acres.
Who is building it?
The applicant is Ekk Infrastructure Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Apr 2026), as of 27 Nov 2026.
Where is it?
In Ulagalampundi, Vikravandi, Viluppuram, Tamil Nadu.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 6.5 acres.
When was it filed?
The application was filed on 30 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Apr 2026 |
| Application filed | 30 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ekk Infrastructure Limited |
| Land area | 6.5 acres (2.6 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Ulagalampundi |
| Taluk / tehsil | Vikravandi |
| District | Viluppuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03000 |
In context
164 applications in Viluppuram since January 2022 are in the same category (Mining): 128 approved, 24 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.5 acres, this one is larger than 61% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Ulagalampundi, Vikravandi, Viluppuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- R. Annamalai, Rough Stone and Gravel Quarry, Extent: 2.43.0ha, S.F.No. 236/3B… — environmental approval granted, 2.3 km away
- V Meenal & CO - Ordinary Earth Quarry, V Sathanur — environmental approval granted, 3.8 km away
- Athanur Village Black Granite Mining Lease Project — environmental approval granted, 4.3 km away
- Aadhanur Black Granite (Dolerite) Quarry Project Belongs to R.K.Ramessh… — returned to applicant, 4.3 km away
- Aadhanur Black Granite (Dolerite) Quarry Project Belongs to R.K.Ramessh… — environmental approval granted, 4.3 km away
- Siruvalai Black Granite Quarry — lapsed, 5.4 km away
- Siruvalai Black Granite Quarry — environmental approval granted, 5.4 km away
- Siruvalai Black Granite Quarry — cleared for impact study, 5.4 km away
More from Ekk Infrastructure Limited in Viluppuram
- Earth Quarry of M/s. EKK Infrastructure Limited — environmental approval granted
All 12 Ekk Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.