Quick answers
What is Thiru. R. Liaquot Ali Khan Rough Stone and Gravel Quarry?
Thiru. R. Liaquot Ali Khan Rough Stone and Gravel Quarry is an approved mining project in Sivandippatti, Kovilpatti, Thoothukkudi, Tamil Nadu. The site covers 11.9 acres.
Who is building it?
The applicant is Liaquot Ali Khan R.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Mar 2026), as of 27 Nov 2026.
Where is it?
In Sivandippatti, Kovilpatti, Thoothukkudi, Tamil Nadu.
How big is it?
It has a stated cost of ₹3 crore and a site of 11.9 acres.
When was it filed?
The application was filed on 29 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Mar 2026 |
| Application filed | 29 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Liaquot Ali Khan R |
| Land area | 11.9 acres (4.8 ha) |
| Project cost | ₹3 crore |
| Village / locality | Sivandippatti |
| Taluk / tehsil | Kovilpatti |
| District | Thoothukkudi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03032 |
In context
97 applications in Thoothukkudi since January 2022 are in the same category (Mining): 79 approved, 14 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.9 acres, this one is larger than 72% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Sivandippatti, Kovilpatti, Thoothukkudi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Roughstone and Gravel Quarry of Thiru.P.I.Jambert Mathuram — environmental approval granted, 700 m away
- Dolomite Quarry of Thiru.N.Ravinthiran — environmental approval granted, 5.7 km away
- Laying of Ug Drinking Water Supply Pipeline (400 Mm Di) Across Kurumalai Rf — forest land use approved, 7.5 km away
- Rough Stone and gravel Quarry of Thiru.K.Anantha Perumal — environmental approval granted, 8.7 km away
- Laying of Under Ground Drinking Water Supply Pipeline ( 400 Mm Di ) Across… — forest land use approved, 8.7 km away
- Sri Venkateswaraa University — environmental approval granted, 11 km away
- Sri Venkateswaraa University — withdrawn, 11 km away
- Proposed Additional Construction of Hospital and Expansion of Educational… — environmental approval granted, 11.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.