One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial Building at SIPCOT Industrial Park Mambakkam (Sriperumbudur – Phase IV) by…
Project details
| Official title | Proposed Construction of Industrial Building at SIPCOT Industrial Park Mambakkam (Sriperumbudur – Phase IV) by M/s. Knorr Bremse India Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Feb 2026 |
| Application filed | 15 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Knorr Bremse India Private Limited |
| Use | Industrial |
| Towers | 7 |
| Floors (tallest) | 3 |
| Height | 18 m |
| Parking spaces | 390 |
| Land area | 46.1 acres (18.6 ha) |
| Built-up area | 1,40,964 m² (15,17,322 sq ft) |
| Plot area | 1,86,439 m² (20,06,811 sq ft) |
| Project cost | ₹1,906.9 crore |
| Village / locality | Mambakkam |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03086 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 4 Apr 2026 | Environmental approval granted | 46.1 acres | ₹1,906.9 crore |
| New project filed 15 Dec 2025 (this page) | Environmental approval granted | 46.1 acres | ₹1,906.9 crore |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 46.1 acres, this one is larger than 72% of them.
35 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mambakkam, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial Building at SIPCOT Industrial Park Mambakkam (Sriperumbudur – Phase… — environmental approval granted, 0 m away
- Proposed Industrial Logistics Park by Polyhose Logistics Park LLP — returned to applicant, 1.2 km away
- Proposed Expansion of Industrial Logistics Park by Polyhose Logistics Park LLP — returned to applicant, 1.2 km away
- Proposed Construction of Dorm — lapsed, 1.2 km away
- Proposed Construction of Dorm — environmental approval granted, 1.2 km away
- Proposed Expansion of Existing Special Economic Zone in Sriperumbudur Sipcot… — lapsed, 1.4 km away
- Proposed Expansion of Existing Special Economic Zone in Sriperumbudur Sipcot… — cleared for impact study, 1.4 km away
- Proposed Amendment in Existing EC received for Expansion of Existing Paints… — environmental approval granted, 1.6 km away
All 3 Knorr Bremse projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.