Quick answers
What is Veeramaransanpettai Village Earth Mining Project?
Veeramaransanpettai Village Earth Mining Project is a lapsed mining project in Kovilpattu, Thanjavur, Tamil Nadu. The site covers 2.5 acres.
Who is building it?
The applicant is Nicholas Arul.
Has it been approved?
No. The application was lapsed on 23 Mar 2026, so it is no longer under consideration.
Where is it?
In Kovilpattu, Thanjavur, Tamil Nadu.
How big is it?
It has a stated cost of ₹4 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 16 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Mar 2026 |
| Application filed | 16 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nicholas Arul |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Kovilpattu |
| Taluk / tehsil | Thanjavur |
| District | Thanjavur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03099 |
In context
6 applications in Thanjavur since January 2022 are in the same category (Mining): 2 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kovilpattu, Thanjavur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kangaiyampatti Village Earth Quarry Mining Lease Project — lapsed, 5.4 km away
- Gravel Quarry of Thiru. Titus Jayaprakash — more information requested, 7.7 km away
- Gravel Quarry of Thiru. Ramalingam — environmental approval granted, 8.1 km away
- Construction of 969 EWS Tenements — environmental approval granted, 11.8 km away
- Construction of 969 EWS Tenements — environmental approval granted, 11.8 km away
- Proposed Expansion In Construction of 969 EWS Tenements Project — environmental approval granted, 11.8 km away
- Proposed expansion of Molasses Based Distillery Unit from 60 KLPD to 90 KLPD… — under environmental review, 41.1 km away
- Existing Molasses Based Distillery Unit from 60 KLPD of Rectified Spirit to 60… — cleared for impact study, 41.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.