Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Jul 2025 |
| Application filed | 3 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shanmugasundaram Chandrasekar |
| Land area | 5.2 acres (2.1 ha) |
| Project cost | ₹97 lakh |
| Village / locality | Arayapatti |
| Taluk / tehsil | Alangudi |
| District | Pudukkottai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03123 |
In context
137 applications in Pudukkottai since January 2022 are in the same category (Mining): 104 approved, 23 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.2 acres, this one is larger than 54% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 11.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Arayapatti, Alangudi, Pudukkottai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thiru.S.Rameshbabu Gravel Quarry — initial checks, 250 m away
- Laying of Aerial OFC Cable across Pathampatti to Senthakudy in Keelayur RF — lapsed, 2 km away
- Laying of Under Ground OFC along the road side from Pudukkottai to Arandangi… — lapsed, 5.1 km away
- Laying of Aerial OFC Cable across Vandarakkottai to Thatchinapuram in… — lapsed, 8.1 km away
- Laying of Aerial OFC Cable in Thiruvarankulam to Manjanviduthi in… — lapsed, 9.2 km away
- Laying of Arial OFC along the road side from Onangudi to Arimalam across… — lapsed, 9.7 km away
- Widening and Strengthening Works on the Road From Pudukkottai – Embal Road… — lapsed, 9.9 km away
- Laying of Aerial OFC Cable across Thiruvarnkulam RF — lapsed, 10.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.