Quick answers
What is this project?
PROPOSED ROUGH STONE QUARRY OF M/s. C.KAMARAJRAJASHREE MINES AND MINERALS is a proposed mining project in Kalpadi North, Perambalur, Tamil Nadu. The site covers 2.5 acres.
Who is building it?
The applicant is Chandrahasan Kamaraj.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 Feb 2026), as of 27 Nov 2026.
Where is it?
In Kalpadi North, Perambalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹2.9 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 29 Nov 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 Feb 2026 |
| Application filed | 29 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Chandrahasan Kamaraj |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹2.9 crore |
| Village / locality | Kalpadi North |
| Taluk / tehsil | Perambalur |
| District | Perambalur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03145 |
In context
96 applications in Perambalur since January 2022 are in the same category (Mining): 70 approved, 15 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 99% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 7.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Kalpadi North, Perambalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone Quarry of M/s.GKP Transports — under environmental review, 150 m away
- Rough stone Quarry of M/s.RRM Transport — under environmental review, 150 m away
- Rough stone Quarry of M/s.RRM Transport — cleared for impact study, 150 m away
- Rough Stone Quarry of M/s.Perambalur Quality Minerals — under environmental review, 650 m away
- Rough Stone Quarry of M/s.Perambalur Quality Minerals — cleared for impact study, 650 m away
- Proposed Roughstone quarry of M/s. Sri Rajakaliamman Mines and Minerals — initial checks, 1.1 km away
- Proposed Roughstone quarry of M/s. Sri Rajakaliamman Mines and Minerals — cleared for impact study, 1.1 km away
- Proposed Rough stone Quarry of M/s. Kavery Stone Crusher, Thiru.N.Selvakumar… — under environmental review, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.