Quick answers
What is Ganapathypatty Village Rough Stone and Gravel Mining Project?
Ganapathypatty Village Rough Stone and Gravel Mining Project is an approved mining project in Ganapatippatti, Harur, Dharmapuri, Tamil Nadu. The site covers 7.7 acres.
Who is building it?
The applicant is King Infra Projects.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Feb 2026), as of 27 Nov 2026.
Where is it?
In Ganapatippatti, Harur, Dharmapuri, Tamil Nadu.
How big is it?
It has a stated cost of ₹92 lakh and a site of 7.7 acres.
When was it filed?
The application was filed on 18 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Feb 2026 |
| Application filed | 18 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | King Infra Projects |
| Land area | 7.7 acres (3.1 ha) |
| Project cost | ₹92 lakh |
| Village / locality | Ganapatippatti |
| Taluk / tehsil | Harur |
| District | Dharmapuri |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03176 |
In context
105 applications in Dharmapuri since January 2022 are in the same category (Mining): 74 approved, 13 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.7 acres, this one is larger than 59% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Ganapatippatti, Harur, Dharmapuri, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- H.Maveripatty Village Rough Stone and Gravel Mining Lease — environmental approval granted, 10.6 km away
- Kattur Village Gravel Mining Project — under environmental review, 10.6 km away
- Kamalampatty Village rough stone and gravel Mining Project — environmental approval granted, 10.7 km away
- Renovation of Hill Path — lapsed, 13.1 km away
- Renovation of Hill Path — lapsed, 13.1 km away
- Shri Ponguru Blue Metal Mines Rough Stone and Gravel Quarry Extent: 2.53.5ha… — environmental approval granted, 13.1 km away
- Shri Ponguru Blue Metal Mines Rough Stone and Gravel Quarry Extent: 2.53.5ha… — cleared for impact study, 13.1 km away
- Reddipatti Village Black Granite Mining Project — environmental approval granted, 13.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.