Quick answers
What is Ordinary Earth Quarry of Tvl.Krishi Infratech?
Ordinary Earth Quarry of Tvl.Krishi Infratech is a lapsed mining project in Iluppakunam, Polur, Tiruvannamalai, Tamil Nadu. The site covers 4.9 acres.
Who is building it?
The applicant is Krishi Infratech.
Has it been approved?
No. The application was lapsed on 4 Feb 2026, so it is no longer under consideration.
Where is it?
In Iluppakunam, Polur, Tiruvannamalai, Tamil Nadu.
How big is it?
It has a stated cost of ₹5 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 29 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 Feb 2026 |
| Application filed | 29 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Krishi Infratech |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Iluppakunam |
| Taluk / tehsil | Polur |
| District | Tiruvannamalai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03365 |
In context
227 applications in Tiruvannamalai since January 2022 are in the same category (Mining): 180 approved, 33 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Iluppakunam, Polur, Tiruvannamalai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry of Thiru.K.Rajendiran — more information requested, 3.5 km away
- ROB and their approaches in lieu of existing LC at Km 103/4 of NH-234 (New… — not approved, 6.5 km away
- ROB and their approaches in lieu of existing LC at Km 103/4 of NH-234 (New… — more information requested, 6.5 km away
- Laying of Underground Ofc Along the Road Side Which Cross the Forest Areas of… — lapsed, 7 km away
- Laying of Aerial Ofc Along the Road Side Which Cross the Forest Areas of… — lapsed, 7.3 km away
- Rough Stone and Gravel of Thiru.A.Raja — environmental approval granted, 8.4 km away
- Rough stone Quarry of Thiru.B.Ilayaraja — environmental approval granted, 8.7 km away
- Access Permission for Construction of Culvert and Approaches Road for the… — forest land use approved, 9.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.