Project details
| Official title | Proposed construction of Industrial and Logistics Park (Light and Heavy Engineering/ Manufacturing/ Assembling Park/ Industrial Storage) |
|---|---|
| Status | Environmental approval granted |
| Status since | 14 Sept 2025 |
| Application filed | 10 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Avigna Dheera Private Limited |
| Use | Industrial |
| Height | 15 m |
| Parking spaces | 3,115 |
| Land area | 33.9 acres (13.7 ha) |
| Built-up area | 77,950 m² (8,39,046 sq ft) |
| Plot area | 1,37,148 m² (14,76,247 sq ft) |
| Project cost | ₹266.8 crore |
| Village / locality | Kuntumarnapalli |
| Taluk / tehsil | Denkanikottai |
| District | Krishnagiri |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03459 |
In context
78 applications in Krishnagiri since January 2022 are in the same category (Buildings & townships): 53 approved, 18 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 33.9 acres, this one is smaller than 55% of them.
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kuntumarnapalli, Denkanikottai, Krishnagiri, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Avigna Industrial sheds at Kundumaranapalli — environmental approval granted, 450 m away
- Industrial Sheds and Warehouse Park by Sapphire Proventures Private Limited — environmental approval granted, 1.5 km away
- M/s. S.S.A. Blue Metals Rough Stone Quarry — environmental approval granted, 2.8 km away
- Building project by NDR Unique Space Private Ltd. — not approved, 3.4 km away
- Expansion of Industrial Building — lapsed, 3.5 km away
- Proposed Construction of Industrial Building — environmental approval granted, 3.5 km away
- M/s. R.V Enterprises Rough stone quarry — lapsed, 3.9 km away
- Hosappuram Village Roughstone Quarry Project — cleared for impact study, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.