Quick answers
What is this project?
Rough Stone Quarry Project Belongs to M/s. ANJANEYAA MINERLAS is a rejected mining project in Padalur (E), Alathur, Perambalur, Tamil Nadu. The site covers 3 acres.
Who is building it?
The applicant is Anjaneyaa Minerals.
Has it been approved?
No. The application was rejected on 18 Dec 2025.
Where is it?
In Padalur (E), Alathur, Perambalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹4 lakh and a site of 3 acres.
When was it filed?
The application was filed on 15 Oct 2025.
Project details
| Status | Not approved |
|---|---|
| Status since | 18 Dec 2025 |
| Application filed | 15 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Anjaneyaa Minerals |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Padalur (E) |
| Taluk / tehsil | Alathur |
| District | Perambalur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03528 |
In context
96 applications in Perambalur since January 2022 are in the same category (Mining): 70 approved, 15 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3 acres, this one is smaller than 83% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 26.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 30 mining leases have applied within 5 km.
Where it is
Padalur (E), Alathur, Perambalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PADALUR (EAST) VILLAGE, ROUGH STONE QUARRY PROJECT BELONGS TO M/s. ANJANEYAA… — not approved, 0 m away
- Rough Stone Quarry of Thiru.R.Vinoth — environmental approval granted, 100 m away
- Rough Stone Quarry of Thiru.R.Vinoth — cleared for impact study, 100 m away
- Rough Stone quarry of M/s.SR Mines and Minerals — under environmental review, 150 m away
- Rough Stone quarry of M/s.SR Mines and Minerals — cleared for impact study, 150 m away
- Rough Stone quarry of M/s.Mars Mines — under environmental review, 200 m away
- Rough Stone quarry of M/s.Mars Mines — cleared for impact study, 200 m away
- Rough Stone Quarry of Thiru. M. Thangaraj — lapsed, 300 m away
More from Anjaneyaa Minerals in Perambalur
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.