Quick answers
What is this project?
This approved industrial building project by Freetrend Industrial India Private Limited is in Jayamkondacholapuram, Udayarpalayam, Ariyalur, Tamil Nadu. It plans buildings of up to 3 floors on 131 acres.
Who is building it?
The applicant is Freetrend Industrial India Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Nov 2025), as of 27 Nov 2026.
Where is it?
In Jayamkondacholapuram, Udayarpalayam, Ariyalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹1,000 crore and a site of 131 acres.
When was it filed?
The application was filed on 16 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Nov 2025 |
| Application filed | 16 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Freetrend Industrial India Private Limited |
| Use | Industrial |
| Floors (tallest) | 3 |
| Height | 18 m |
| Parking spaces | 705 |
| Land area | 131 acres (53 ha) |
| Built-up area | 1,86,164 m² (20,03,851 sq ft) |
| Plot area | 5,30,011 m² (57,04,985 sq ft) |
| Project cost | ₹1,000 crore |
| Village / locality | Jayamkondacholapuram |
| Taluk / tehsil | Udayarpalayam |
| District | Ariyalur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03637 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Oct 2025 (this page) | Environmental approval granted | 131 acres | ₹1,000 crore |
| Early planning filed 9 Jun 2025 | Cleared for impact study | 131 acres | ₹1,000 crore |
Where it is
Jayamkondacholapuram, Udayarpalayam, Ariyalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by Freetrend Industrial India Private Limited — cleared for impact study, 0 m away
- Onshore Development and Production of Oil & Gas from 10 wells in Pandanallur… — cleared for impact study, 9.9 km away
- Laying of aerial OFC thorough TNEB Poles (Existing-60), (New-22) along the… — more information requested, 11.2 km away
- Thiru.G.Ezhilnilavan Gravel Quarry — environmental approval granted, 13.7 km away
- Laying of Over Head 33kv Power Transmission Line in outside of RoW of roads in… — lapsed, 13.9 km away
- Laying of Aerial Ofc Along the Road Side of Andimadam,sendurai,t.Palur Blocks — more information requested, 15.9 km away
- Laying of Aerial Ofc Along the Road Side of Andimadam,sendurai,t.Palur Blocks — lapsed, 15.9 km away
- M.Aruna,Fireclay , Extent of 1.78.11ha in S.F.Nos. 6/3, 6/4 — environmental approval granted, 16.5 km away