What is Developing? Open the mapMap

Environmental approval grantedMining · Virudhunagar, Tamil Nadu

Rough Stone and Gravel Quarry of Thiru. S. Ramesh, At Survey No. 785/2, over an area of 1.73.50hectares

Rough Stone and Gravel Quarry of Thiru. S. Ramesh, At Survey No. 785/2, over an area of 1.73.50hectares is an approved mining project in Kosukundu, Sattur, Virudhunagar, Tamil Nadu. The site covers 4.3 acres. Its stated project cost is ₹47 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 14 Jun 2025).

See it on the live map All projects in Virudhunagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Rough Stone and Gravel Quarry of Thiru. S. Ramesh, At Survey No. 785/2, over an area of 1.73.50hectares is an approved mining project in Kosukundu, Sattur, Virudhunagar, Tamil Nadu. The site covers 4.3 acres.

Who is building it?

The applicant is S Ramesh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 14 Jun 2025), as of 27 Nov 2026.

Where is it?

In Kosukundu, Sattur, Virudhunagar, Tamil Nadu.

How big is it?

It has a stated cost of ₹47 lakh and a site of 4.3 acres.

When was it filed?

The application was filed on 22 Mar 2025.

Project details

Official titleRough Stone and Gravel Quarry of Thiru. S. Ramesh, At Survey No. 785/2, over an area of 1.73.50hectares In Kosukundu Village, Sattur Taluk, Virudhunagar District, Tamil Nadu
StatusEnvironmental approval granted
Status since14 Jun 2025
Application filed22 Mar 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantS Ramesh
Land area4.3 acres (1.7 ha)
Project cost₹47 lakh
Village / localityKosukundu
Taluk / tehsilSattur
DistrictVirudhunagar
StateTamil Nadu
Location fromSite boundary on record
Our referenceWID-TN-03701

In context

207 applications in Virudhunagar since January 2022 are in the same category (Mining): 152 approved, 34 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.3 acres, this one is smaller than 63% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Kosukundu, Sattur, Virudhunagar, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.