Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Dec 2025 |
| Application filed | 24 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shajaghan Harib Meer |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Uttamacholapuram |
| Taluk / tehsil | Nagapattinam |
| District | Nagapattinam |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03770 |
In context
9 applications in Nagapattinam since January 2022 are in the same category (Mining): 3 approved, 0 filed or under review, and 6 withdrawn, lapsed or rejected.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Uttamacholapuram, Nagapattinam, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 9 MMTPA Cauvery Basin Refinery — lapsed, 2.7 km away
- 9 MMTPA Cauvery Basin Refinery — withdrawn, 2.7 km away
- Ordinary Earth Quarry for Thiru.A.Aklilan — lapsed, 4.1 km away
- Obtaining CRZ Clearance of Proposed Construction of Neithal Heritage Park… — recommended by coastal authority, 7.1 km away
- Desalination plant at Nagapattinam, Tamil Nadu — lapsed, 7.2 km away
- Proposed Development of Fish Landing Centre at Samanthanpettai village,… — more information requested, 7.9 km away
- 20MT Ice Plant cum Diesel Outlet Bearing Survey No.2891(pt) at Nambiyar Nagar — recommended by coastal authority, 8.6 km away
- Obtaining CRZ Clearance to the Existing Edible Oil Storage tanks inside… — lapsed, 9.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.