One of 2 filings for this project. The project's main page, with every filing and where each stands: Area Development Within the Existing Tyre Manufacturing Unit
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Oct 2025 |
| Application filed | 24 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Atc Tires Private Limited |
| Use | Industrial |
| Land area | 115 acres (46.5 ha) |
| Project cost | ₹52.9 crore |
| Village / locality | Gangaikondan |
| Taluk / tehsil | Tirunelveli |
| District | Tirunelveli |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03852 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 5 Mar 2026 | Environmental approval granted | 115 acres | ₹52.9 crore |
| Early planning filed 24 Sept 2025 (this page) | Cleared for impact study | 115 acres | ₹52.9 crore |
In context
34 applications in Tirunelveli since January 2022 are in the same category (Buildings & townships): 19 approved, 12 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 115 acres, this one is larger than 59% of them.
39 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gangaikondan, Tirunelveli, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Area Development Within the Existing Tyre Manufacturing Unit — environmental approval granted, 0 m away
- Proposed expansion of Industrial building at Plot No. A13, A14, A15 & A16,… — environmental approval granted, 550 m away
- Proposed Expansion of Solar PV Cell & Module Manufacturing Plant by VSL Green… — environmental approval granted, 600 m away
- Proposed Expansion of Solar PV Cell & Module Manufacturing Plant by VSL Green… — cleared for impact study, 600 m away
- Proposed Expansion of Solar PV Cell & Module Manufacturing Plant by VSL Green… — environmental approval granted, 600 m away
- Proposed Expansion of Solar PV Cell & Module Manufacturing Plant by VSL Green… — cleared for impact study, 600 m away
- Proposed Solar PV Module Manufacturing & Assembling Plant by M/s. VSL Green… — environmental approval granted, 800 m away
- Proposed Solar PV Module Manufacturing & Assembling Plant by M/s. VSL Green… — environmental approval granted, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.