What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Chengalpattu, Tamil Nadu

Proposed Expansion for Construction of Software Development Complex

Proposed Expansion for Construction of Software Development Complex is an approved office project in Egattur, Tiruporur, Chengalpattu, Tamil Nadu. It plans 4 towers of up to 11 floors on 13.3 acres. Its stated project cost is ₹281.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 13 Feb 2026).

See it on the live map All projects in Chengalpattu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion for Construction of Software Development Complex is an approved office project in Egattur, Tiruporur, Chengalpattu, Tamil Nadu. It plans 4 towers of up to 11 floors on 13.3 acres.

Who is building it?

The applicant is Intellect Design Arena Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 13 Feb 2026), as of 27 Nov 2026.

Where is it?

In Egattur, Tiruporur, Chengalpattu, Tamil Nadu.

How big is it?

It has a stated cost of ₹281.5 crore and a site of 13.3 acres.

When was it filed?

The application was filed on 2 Sept 2025.

Project details

StatusEnvironmental approval granted
Status since13 Feb 2026
Application filed2 Sept 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantIntellect Design Arena Limited
UseIT / offices
Towers4
Floors (tallest)11
Basements1
Height46 m
Parking spaces4,312
Land area13.3 acres (5.4 ha)
Built-up area74,910 m² (8,06,324 sq ft)
Plot area54,025 m² (5,81,520 sq ft)
Project cost₹281.5 crore
Village / localityEgattur
Taluk / tehsilTiruporur
DistrictChengalpattu
StateTamil Nadu
Location fromSite boundary on record
Our referenceWID-TN-03948

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 24 Nov 2026Initial checks13.3 acres₹281.5 crore
Amendment filed 20 Jun 2026Returned to applicant13.3 acres₹281.5 crore
Expansion filed 2 Sept 2025 (this page)Environmental approval granted13.3 acres₹281.5 crore

In context

302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 13.3 acres, this one is larger than 58% of them.

61 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Egattur, Tiruporur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Intellect Design Arena Limited in Chengalpattu

All 6 Intellect Design Arena projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.