Quick answers
What is Proposed Expansion in Construction of Industrial Building?
Proposed Expansion in Construction of Industrial Building is an approved industrial building project in Mahajanambakkam, Cheyyar, Tiruvannamalai, Tamil Nadu. It plans 5 towers of up to 3 floors on 60 acres.
Who is building it?
The applicant is Eicher Motors Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 Jan 2026), as of 27 Nov 2026.
Where is it?
In Mahajanambakkam, Cheyyar, Tiruvannamalai, Tamil Nadu.
How big is it?
It has a stated cost of ₹1,103.8 crore and a site of 60 acres.
When was it filed?
The application was filed on 26 Nov 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 31 Jan 2026 |
| Application filed | 26 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Eicher Motors Limited |
| Use | Industrial |
| Towers | 5 |
| Floors (tallest) | 3 |
| Height | 18 m |
| Parking spaces | 3,346 |
| Land area | 60 acres (24.3 ha) |
| Built-up area | 1,45,165 m² (15,62,542 sq ft) |
| Plot area | 2,42,700 m² (26,12,399 sq ft) |
| Project cost | ₹1,103.8 crore |
| Village / locality | Mahajanambakkam |
| Taluk / tehsil | Cheyyar |
| District | Tiruvannamalai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03991 |
In context
13 applications in Tiruvannamalai since January 2022 are in the same category (Buildings & townships): 7 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 60 acres, this one is larger than 54% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahajanambakkam, Cheyyar, Tiruvannamalai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mahindra & Mahindra LTD, Mahindra Suv Proving Track (Mspt), Mahindra Research… — under environmental review, 1.3 km away
- Mahindra & Mahindra LTD, Mahindra Suv Proving Track (Mspt), Mahindra Research… — environmental approval granted, 1.3 km away
- Mahindra & Mahindra LTD, Mahindra Suv Proving Track (Mspt), Mahindra Research… — cleared for impact study, 1.3 km away
- Rough Stone and Gravel Quarry of Thiru.V.Pavan Voora — environmental approval granted, 1.3 km away
- Amendment in Environmental Clearance for the "development of Sipcot Industrial… — environmental approval granted, 2.3 km away
- Development of SIPCOT Industrial Park — returned to applicant, 2.3 km away
- Karanai Village Rough Stone and Gravel Mining Project — under environmental review, 2.6 km away
- Proposed Expansion in Construction of Industrial Buildings by M/s. SCHWING… — environmental approval granted, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.