Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Jun 2025 |
| Application filed | 6 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Nova Carbons India Private Limited |
| Use | Industrial |
| Towers | 15 |
| Floors (tallest) | 1 |
| Height | 20 m |
| Land area | 23.5 acres (9.5 ha) |
| Built-up area | 38,821 m² (4,17,865 sq ft) |
| Plot area | 95,222 m² (10,24,960 sq ft) |
| Project cost | ₹187.3 crore |
| Village / locality | Gangaikondan |
| Taluk / tehsil | Tirunelveli |
| District | Tirunelveli |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03993 |
In context
34 applications in Tirunelveli since January 2022 are in the same category (Buildings & townships): 19 approved, 12 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 23.5 acres, this one is smaller than 56% of them.
41 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gangaikondan, Tirunelveli, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Solar PV Module Manufacturing & Assembling Plant by M/s. VSL Green… — environmental approval granted, 450 m away
- Proposed Solar PV Module Manufacturing & Assembling Plant by M/s. VSL Green… — environmental approval granted, 450 m away
- Proposed Expansion of Solar PV Cell & Module Manufacturing Plant by VSL Green… — environmental approval granted, 650 m away
- Proposed Expansion of Solar PV Cell & Module Manufacturing Plant by VSL Green… — cleared for impact study, 650 m away
- Proposed Expansion of Solar PV Cell & Module Manufacturing Plant by VSL Green… — environmental approval granted, 650 m away
- Proposed Expansion of Solar PV Cell & Module Manufacturing Plant by VSL Green… — cleared for impact study, 650 m away
- Active Pharma Ingredients (Bulk Drug and Intermediates) Manufacturing Unit — returned to applicant, 850 m away
- Active Pharma Ingredients (Bulk Drug and Intermediates) Manufacturing Unit — cleared for impact study, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.