One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of Manufacturing Industrial Building by M/s CATERPILLAR INDIA PRIVATE…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 Jul 2025 |
| Application filed | 16 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Caterpillar India Private Limited |
| Use | Industrial |
| Land area | 183.5 acres (74.3 ha) |
| Project cost | ₹2,503.4 crore |
| Village / locality | Mel Nallattur |
| Taluk / tehsil | Thiruvallur |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04059 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 Aug 2025 | Environmental approval granted | 183.5 acres | ₹2,503.4 crore |
| Early planning filed 16 Jun 2025 (this page) | Cleared for impact study | 183.5 acres | ₹2,503.4 crore |
In context
119 applications in Thiruvallur since January 2022 are in the same category (Buildings & townships): 69 approved, 37 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 183.5 acres, this one is larger than 87% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mel Nallattur, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of Manufacturing Industrial Building by M/s CATERPILLAR… — environmental approval granted, 0 m away
- Proposed Expansion to Construction of Industrial & Logistics Building — under environmental review, 3.9 km away
- Thirupachur Village Ordinary Earth Mining Lease — environmental approval granted, 4 km away
- Polivakkam Village Ordinary Earth Mining Project — lapsed, 4.3 km away
- Polivakkam Village Ordinary Earth Mining Project — environmental approval granted, 4.4 km away
- Thirupachur Village Ordinary Earth Mining Lease — environmental approval granted, 4.8 km away
- Proposed Change in Product Mix And Expansion Within Existing Pharmaceutical Unit — environmental approval granted, 5.2 km away
- Industrial project by M/s. Sri Hari Labs — returned to applicant, 5.4 km away
All 3 Caterpillar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.