Quick answers
What is this project?
Proposed expansion and construction of "The Marina" – A Mixed Development of Mall, Hotel, Multiplex and Residential Apartments is an approved mixed-use project in Egattur, Tiruporur, Chengalpattu, Tamil Nadu. It plans 100 units in 2 towers of up to 12 floors on 6.2 acres.
Who is building it?
The applicant is Aslam Packeer Mohamed.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Jan 2026), as of 27 Nov 2026.
Where is it?
In Egattur, Tiruporur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹423.7 crore and a site of 6.2 acres.
When was it filed?
The application was filed on 1 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Jan 2026 |
| Application filed | 1 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Aslam Packeer Mohamed |
| Use | Mixed use |
| Units | 100 |
| Towers | 2 |
| Floors (tallest) | 12 |
| Basements | 3 |
| Height | 48 m |
| Parking spaces | 1,589 |
| Land area | 6.2 acres (2.5 ha) |
| Built-up area | 15,570 m² (1,67,594 sq ft) |
| Plot area | 25,131 m² (2,70,508 sq ft) |
| Project cost | ₹423.7 crore |
| Village / locality | Egattur |
| Taluk / tehsil | Tiruporur |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04077 |
In context
302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.2 acres, this one is smaller than 63% of them.
63 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Egattur, Tiruporur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Construction of High Rise Residential Building Development by DRA… — environmental approval granted, 500 m away
- Residential building by M/s. Emami Realty Limited — under environmental review, 550 m away
- Residential building by M/s. Emami Realty Limited — cleared for impact study, 550 m away
- Proposed Expansion in Construction and Repurposing the existing Engineering… — environmental approval granted, 650 m away
- Data Centre Building by Reliance Jio Infocomm Ltd — initial checks, 700 m away
- Data Centre Building by Reliance Jio Infocomm Limited — environmental approval granted, 700 m away
- Data Centre Building by Reliance Jio Infocomm Limited — environmental approval granted, 700 m away
- Proposed Expansion for Construction of Data Centre Building — environmental approval granted, 700 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.