Project details
| Official title | Proposed Construction of Residential and Commercial Building |
|---|---|
| Status | Cleared for impact study |
| Status since | 19 Aug 2025 |
| Application filed | 21 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Ceebros Property Development P LTD |
| Use | Mixed use |
| Land area | 8.9 acres (3.6 ha) |
| Project cost | ₹900.2 crore |
| Village / locality | Okkianthorapakkam |
| Taluk / tehsil | Sholinganallur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04110 |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.9 acres, this one is smaller than 69% of them.
47 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Okkianthorapakkam, Sholinganallur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- High Rise Residential Group Development Building by M/s. Radiance Realty… — environmental approval granted, 400 m away
- Providing Underground Sewerage Scheme To Okkium Thoraipakkam (Div 193, 195 &… — coastal clearance granted, 500 m away
- Proposed Development of a Single Block Residential Building — lapsed, 650 m away
- High-Rise Group Development by M/s Baashyaam Ventures Private Limited and M/s… — environmental approval granted, 1 km away
- High-Rise Group Development by M/s Baashyaam Ventures Private Limited and M/s… — cleared for impact study, 1.1 km away
- Building project by M/s Questiva Estates LLP — environmental approval granted, 1.1 km away
- Bridge across Buckingham Canal connecting Rajiv Gandhi Salai and ECR — recommended by coastal authority, 1.2 km away
- Bridge across Buckingham Canal connecting Rajiv Gandhi Salai and ECR — environmental approval granted, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.