Quick answers
What is Mulvoy Village Gravel and Boulders Mining Project?
Mulvoy Village Gravel and Boulders Mining Project is an approved mining project in Mulvoy, Arakonam, Ranipet, Tamil Nadu. The site covers 16.1 acres.
Who is building it?
The applicant is M Sanjay.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Sept 2025), as of 27 Nov 2026.
Where is it?
In Mulvoy, Arakonam, Ranipet, Tamil Nadu.
How big is it?
It has a stated cost of ₹8 lakh and a site of 16.1 acres.
When was it filed?
The application was filed on 15 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Sept 2025 |
| Application filed | 15 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M Sanjay |
| Land area | 16.1 acres (6.5 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Mulvoy |
| Taluk / tehsil | Arakonam |
| District | Ranipet |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04263 |
In context
74 applications in Ranipet since January 2022 are in the same category (Mining): 46 approved, 20 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 16.1 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Mulvoy, Arakonam, Ranipet, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Velurpet Village Gravel & Pebbles Mining Lease — environmental approval granted, 1.8 km away
- Gravel and Pebbles Quarry Project Belongs to M/s. Oriental Structural… — environmental approval granted, 2.2 km away
- Perunkalathur Earth Quarry — lapsed, 9.5 km away
- Arakkonam Railway Junction Existing track and road approaches — not approved, 10.8 km away
- Thakkolam Village Rough Stone and Gravel Mining Lease — environmental approval granted, 11.1 km away
- Thakkolam Village Rough Stone and Gravel Mining Lease — environmental approval granted, 11.1 km away
- Aathur Village Rough Stone Mining lease Project — not approved, 11.1 km away
- Proposed Rough Stone & Gravel Quarry of M/s. Sri Thanigai Murugan infra — lapsed, 11.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.